TSA Planning and Heron Property Ltd Tobermore Road Pre-Application Community Consultation

Proposed Development

The proposed development comprises the erection of a B2 Industrial Building to facilitate the expansion of an existing food production facility, with associated loading, storage, office and ancillary accommodation. The building will provide approximately 7,416sqm gross floor space and will accommodate loading and marshalling areas, storage facilities, plant rooms, office accommodation and staff welfare facilities. The proposed building will support the expansion of the existing food production facility. The products are stored under controlled conditions to develop their final characteristics prior to sale and distribution as part of the expansion of the existing food production facility. The building will also provide associated loading, storage, office and ancillary accommodation required to support the ongoing operation of the facility. The proposed building is of steel portal frame construction with a maximum height of approximately 15.6 metres, incorporating a lower eaves height of approximately 13.4 metres. External finishes will comprise Kingspan insulated roof and wall cladding panels in a combination of grey tones, with windows, doors and other external elements finished in RAL 9005 Jet Black. The development is intended to facilitate the continued operation and expansion of the business at this location, and will utilise the existing access arrangements onto Tobermore Road.

NOTES Do not scale from drawings. All discrepancies to be reported to the architect immediately. All dimensions to be verified by contractor on site prior to any works.

©

REVISIONS: No:

Description:

Date: By:

Checked:

Sinks

3

EP

47.11 600Ø Pipe

IL

48.66

47.16

IL

SF

1000Ø Pipe

48.64

DP

48.36

48.01

47.17

48.64

63

5

O/H Elec Wires

48.57

48.68

48.52

49.500

49.0

49.20

48.68

48.36

49.97

4a

Roof=55.27

6

50.07

50.0

EP

49.72

48.61

49.0

14m

48.34

53.29 52.41

52.0

49.43

Wall

48.85

51.150

51.0

48.57

51.58

49.06

48.77 48.93

8.2m

7

53.01

MH

48.79

49.500

50.0

51.31

53.08

50.150

48.88

53.0

Wall

P 49.07 49.23 49.05 48.95

53.00

48.81

53.16

49.0

50.90

EP

50.250

49.18

49.0

49.100

MH

Issues

Kerb

52.0

49.28

50.05

P

LP

49.18

49.36

49.18

52.89

49.22

O/H Elec Wires

49.26

G 49.52 49.39 49.36

51.0

1.2m highretaining wall

Channel

49.61

53.05

49.41

49.26

49.30

53.01

49.65

Kerb

49.37

53.17

50.0

Kerb

50.250

49.61

O/H Elec Wires

49.64

49.49

Ridge=58.04

Eaves=56.39

LP

MH

52.91

49.74

49.59

49.47

49.42

52.350

49.53

49.60

53.0

O/H Elec Wires

53.32

G

Channel

49.62

49.65

49.700

MH

51.97

MH 49.69 49.79 49.8449.95

49.58

Bin

49.54

49.91 49.85

MH

FFL.

LP

49.57

51.250 52.0

49.72

49.80

MH

MH

EP

49.65

50.91

49.85

49.81

Wall

EP

49.94

49.97

50.0

LP

50.07

50.21

MH

50.17

53.53

Kerb

RH

49.89

49.75

Channel

MH

G 49.92 49.94

49.98

49.76

MH

Kerb

51.0

52.97

49.95

53.68

49.74

49.84

Barbed Wire Fence 1.10m

50.04

53.550

53.87

MH

49.86

50.05

50.16

50.250

52.60

51.65

50.02

50.55

49.78

4.6m

O/H Elec Wires

LP

50.15

50.250

50.29

Grass

50.17

50.20

50.33

49.96

51.21

50.34

Kerb

54.17

49.88

49.79

50.41

50.34

50.06

EP

49.78

Kerb

49.63

LP

49.61

49.91

G

G

50.44

MH

50.69

50.46

50.98

50.59

54.0

50.44

50.69

50.69

50.54

50.52

49.83

53.0

49.70

LP

Kerb

50.38

50.52

49.70

50.55

50.58

49.71

G

49.76

49.78

50.56

50.663 50.68

50.59

50.60

50.58

50.54

7

49.88

50.65

50.66

Kerb

Kerb

8

50.126

49.85

Kerb

50.55

Kerb

50.87 50.84

50.83

52.0

50.68

49.72

50.71

50.77

50.04

49.90

MH

Kerb

50.73

53.550

MH MH

50.85

50.78

50.81

50.80

50.84

49.75

MH

MH

50.78

49.92

LP

50.25 50.37 50.57

Canopy Edge

50.88

Canopy Edge

51.07

Channel

50.55

53.93

49.74

49.75

50.78

Wall

51.0

49.75

50.91

50.76

51.01

BL

BL

BL

BL

49.74 49.74

51.04

ER 50.94

ER

50.92

51.02

51.03

50.93

51.02

MH 51.03 51.03 49.75 49.72

ER

51.05

49.75

G

G

G

G

G

49.81

G

FL

49.94

49.78

DP

49.78

50.37

49.89

50.58

MH

50.95

51.02

Kerb

58.85

51.05

49.78

FL

50.68

50.79

53.20

Wall

50.78

50.28

49.80 49.98

Kerb

6

51.28

51.14

51.15

51.04

50.934

50.78

O/H Elec Wires

50.62

54.0

50.95

50.60

50.68

51.01

52.95

2.4m highretaining wall

ER 50.92 50.97

52.48

50.78

FL

52.00

DP

ER

G

Kerb

51.08

50.95

LP

51.04

51.10

50.06

50.29

BL

51.06 51.11

G G

54.12

51.17

51.00 Kerb Kerb 50.85

49.67

51.53

49.73 49.72

MH

G

CH

RS 51.37

Kerb Kerb

49.69

49.45

RS

51.100

51.21

G

51.39

51.33

51.06

51.30

50.45

G

49.70

49.39

51.23

51.45

BL

51.49

49.97

51.35

49.85

51.08

51.33

53.0

51.17

9

53.550

51.10

51.06

51.460 51.53

LP 50.67 50.62 Kerb

FL

50.21

51.12

N

52.0

49.81

MH

51.65

EP

51.63

49.95

51.79

51.28

53.22

49.80

51.77

Kerb

Ridge=61.20

51.86

51.69

Eaves=58.85

51.30

51.31

JB P

G

G

JB P

51.91

51.89

51.11

52.03

50.03

51.70

51.10

LP

52.98

50.90 50.91

ER

50.23

P

G

50.43

P

50.87

MH

52.01

50.08

51.15

54.10

ER

52.67

51.93 51.90

50.46

52.07

52.07

50.88

50.97

50.96

MH

Kerb

50.40

52.31

50.40

51.00

Kerb

Kerb

50.98

52.33

50.99

50.34

P

P

51.21

50.63

MH

LP

50.57

50.56

51.100

51.100

50.76

G

51.03

50.90

DP

50.58

52.02 52.48

50.87

50.36

52.54

52.34

DP P

P 52.52 52.63

P

P

50.99

1

50.649

51.450

51.18

54.0

52.57 52.38

52.45

Kerb

51.150

50.56

52.64 Wall

50.93

50.79

Kerb

50.43

52.45

50.89

G 50.95 50.93 50.93

50.97

50.99

50.84

50.91

G

52.51

50.92

50.98

ER

50.89

G

50.52

G

P 50.98

G

53.34

54.18 7.6m

FL

50.96

53.15

ER

50.86

50.94

50.95

50.93

50.90

50.88

MH

52.98

ER

R/Wall

Kerb

ER

50.81

50.80

P

R/Wall

Kerb

10

52.58

53.0

52.53

52.761

50.86

MH 51.31

G

G

G

Barbed Wire Fence 1.10m

50.89

52.47

52.58

Wall

G

G

53.09

53.550

52.58

50.74

51.61

52.87

52.80

51.11

51.30

50.90

53.02 53.01

52.52

52.47

51.22

52.88

53.07

52.54

54.0

53.03

52.63

52.86

51.10

(Overgrown)

53.13

52.66

53.17

BM 58.72

51.34

51.26

55.0

52.64

51.19

52.91

53.13

2

52.34

52.079

52.32

52.49

53.58 53.50

56.0

Crash Barrier

52.20

P

53.66

WM

TP

53.56

52.55

RS

52.30

58.0

52.58 52.72

56.53

Kerb

54.30 54.41 54.38

55.99 56.04

58.00

54.81

TP 52.97

51.95

52.41

55.40 55.14

57.0

52.98

Crash Barrier

53.10

51.84

Crash Barrier

Crash Barrier

52.21

MH

52.48

5

53.22 53.09 53.15

4

54.642

52.83

54.966

53.16

57.17

57.57 57.54

54.54

SV

57.90

52.18

56.96

58.64

56.75

58.62

56.81

G

58.35

52.21

53.86

56.48

54.98

52.45

53.56

52.37

52.29

53.06 53.06

52.83 52.90

53.80

56.46

56.85

54.88

57.47

57.98

58.22

55.95

55.35

O/H Elec Wires

57.09

52.41

56.82

52.39 52.44

52.38

53.38

52.90 52.92 52.99

56.75 57.09

54.43 54.35 54.44

53.87 53.90

58.10

56.78

57.54

56.06

54.99 54.97 54.90

57.08

57.33 56.79 56.87

56.55 56.52 56.65 56.75

52.72

O/H Elec Wires

SV SV

55.37 55.48

52.33

52.43

SV

52.60 52.69

52.37

53.33 53.34

52.54

58.37 58.03

G

AV

56.82 56.70

G

52.68

56.06 56.32

53.72 52.95

57.02 57.36

53.04

53.09 53.85

O/H Elec Wires

O/H Elec Wires

EP

52.59

EP

57.49 57.32 57.42

52.96

AP

57.62 57.49

55.45

53.36

53.45

53.93

Project :

at Magherafelt for Heron Bros Proposed New Industrial Building

54.08

57 Tobermore Road Proposed Block Plan

59.4

Title :

57.3

52.7

18/07/17

Iss

PROJECT NO: DATE:

1:500 26/05/26 M-1525b

CHECKED BY: DRAWN BY: DRAWING NO:

FR MMcC PL-03-1st

SCALE:

Conveyor

ESS

CH

Wb

33 King Street, Magherafelt, BT45 6AR n T: 028 7930 1126 info@mcgurk-architects.com n www.mcgurk-architects.com

Proposed Site Layout

Made with FlippingBook. PDF to flipbook with ease