Lacuna Developments and Radius Housing - Lakeside Coleraine Pre-Application Community Consultation
Lakeside Coleraine Pre-Application Community Consultation
HELLO AND WELCOME INTRODUCTION
Welcome to our Pre-Application Community Consultation (PACC) event relating to our proposals for Proposed Residential Development comprising c.140 dwelling units, public open space, landscaping, new internal road network, access arrangements, parking, and all ancillary site works (amendment to approved layout ref: LA01/2017/0732/RM) on Lands at the former Maxwell’s Spittal Hill Quarry, 209 Bushmills Road, Coleraine. PURPOSE OF CONSULTATION AND NEXT STEPS The purpose of this consultation is to share our indicative proposals with the community and other interested parties, prior to the submission of a Full Planning Application to Causeway Coast and Glens Borough Council. We are committed to engaging with members of the wider community and are now undertaking a period of pre application community consultation (PACC) on our proposals. The feedback received will be shared with the design team and will help to shape our proposals prior to the submission of a planning application. We will prepare a Pre-Application Community Consultation Report which will provide a summary of all feedback, our response and how we have incorporated any appropriate feedback into the final proposals for the scheme. This report will be submitted as part of the Full Planning Application to Causeway Coast and Glens Borough Council. HOW TO PROVIDE FEEDBACK AND FIND OUT MORE CONSULTATION EVENT An in-person drop-in event will be held in Harpurs Hill Community Centre, 90 Tullyarton Rd, Coleraine BT52 2EL from 3pm to 7pm on 12th May 2026 to allow interested parties to view the display boards for the proposal. Information on the proposals, as also included on the consultation website, are on display today and members of the design team are in attendance to answer any queries. Comment cards are available to provide any feedback. WEBSITE A dedicated website (www.lakesideconsultation.com) is also available from today for interested parties to view the consultation documentation and site proposals, as well as the pre-application consultation steps being taken. This will be kept up to date consistently and contains an online version of the display boards that are available for viewing today, as well as a facility to provide feedback via the online platform and contact information of the technical team. The website is live until 5pm on Friday 12th June 2026. LEAFLETS Information Leaflets have been delivered to all businesses and properties within 200m of the subject site. This leaflet included information on the development, details of the consultation website, the drop-in event at Harpur’s Hill Community Centre, and details of the point of contact within the Technical Team to ask questions, or to provide feedback on the proposal. SPEAK TO US POST: TSA Planning, 20 May Street, Belfast, BT1 4NL EMAIL: info@tsaplanning.co.uk TEL: 028 9043 4333 Our project team is available Monday-Thursday 9am-5pm and Friday 9am-2pm to discuss the proposals or respond to any queries you may have. CLOSING DATE FOR FEEDBACK – FRIDAY 12TH JUNE 2026.
LACUNA DEVELOPMENTS We are home creators and developers with a special passion; to provide high quality homes.
Established in 1991, Lacuna has grown steadily over the last three decades and is involved in property development and investment throughout Northern Ireland and the UK. Lacuna has experience in a wide range of property markets including residential development, purpose built student accommodation, mixed use schemes, high street retail and office development. Known for their positive impact on Belfast’s residential and student housing, Lacuna is heavily involved in a number of large-scale developments across Northern Ireland, including multiple residential projects across Belfast. A key recent project includes the Loft Lines, Titanic Quarter, Belfast – Northern Ireland’s first large scale Build to Rent (BTR) scheme delivered as part of a major mix tenure scheme including social and affordable housing. Of other similar scale to that of the proposed development at Lakeside Coleraine includes a mixed use scheme at Moira Road, Lisburn comprising 38 dwellings and 53 apartments, 6 no Class B2 industrial/employment units; social and intermediate for rent; and, a mixed use development of social and private residential units at former Park Avenue hotel site in Belfast. EXPERIENCE Lacuna Developments is one of Northern Ireland’s leading development and investment companies. Established in 1991, Lacuna is a family run company. It was originally established by David Best and is now run by his son Anthony. Anthony Best, a chartered surveyor who previously worked in the London property market. The business has grown steadily over more than three decades and is now regarded as one of Northern Ireland’s more established private development companies. Lacuna Developments has also been recognised in its development with awards like the Commercial Development of the Year award at the 2024 Belfast Telegraph Property Awards for Nelson Place. This major Belfast student accommodation project, operated by Student Roost, offers 774 en-suite and studio apartments alongside comprehensive, high-quality amenities to support student well-being. Lacuna Developments was lauded for setting new standards in purpose-built student accommodation.
SITE CONTEXT AND LOCATION SURROUNDING CONTEXT The 11.35 ha site is located at Lakeside Residential Development, Lands at former Maxwell’s Spittal Hill Quarry, 209 Bushmills Road, Coleraine BT52 2BX. The surrounding context of the site is mainly residential in character, but the site is also benefits from nearby other services and community uses, including a local Spar shop, Harpurs Hill Community Centre south of the site, North Coast Integrated College and Logue’s industrial estate to the east on higher ground. Coleraine Train Station is approximately a ten-minute walk from the site, or a fifteen-minute walk to Coleraine Town Centre. THE SITE The site is accessed directly from Bushmills Road via the existing residential development of Lakeside which includes Lakeside Mews, Lakeside Court, Lakeside Lane, Lakeside Drive and Lakeside Gardens. The topography slopes from the Bushmills Road to the south of the site, and towards the water’s edge of the quarry lake. Another phase of the development is currently under construction to the south west of the site. There is some vegetation throughout the site and mature vegetation on the southern boundary. The site forms the next phase of residential development at Lakeside where 126 units have been constructed, and a further 36 units are currently under construction as shown on map areas A & B Below. The current proposal is Phase 2 of the Lakeside development and will provide c140 residential units as shown in area C below. Client: Lacuna KEY:
N
OSNI MAP REFERRED TO PLAN No. 01309SE2 CROWN COPYRIGHT RESERVED COPYRIGHT LICENCE 2341
DENOTES THE EXTENT OF LAND RELATING TO PHASE 2 (SITE SIZE: 11.3569ha) DENOTES THE EXTENT OF LAND RELATING TO PHASE 1 (SITE SIZE: 1.3674ha)
7-9 Stone Row, Coleraine. BT52 1EP T: 028 70354400
Drawing Title: Site Location Plan
Project Title:
E: start@mi-architects.com W: www.mi-architects.com
RB GM
25-113-001
1:2500 @A3
Residential Development, Lakeside, Bushmills Road, Coleraine
THIS DRAWING IS COPYRIGHT BY Mi ARCHITECTS AND/OR THEIR CLIENTSDO NOT SCALE FROM THIS DRAWING: FIGURED DIMENSIONS SHOULD BE USED IN PREFERENCE
A 126 units constructed B 36 units under construction C Phase 2 proposed c.140 units
PLANNING HISTORY 7 14 10 Und 12a 102
Planning history
N
13
8
104
1
2
CF
5
Planning reference
Description
Status
17
1
2
13
11
96
98
100
Craigavon
LA01/2021/1029/F
Proposed Residen ti al Development comprising of 36No. Units to include 8No. detached, 22No. semi-detached and 6No. townhouses (reduc ti on of 4No. units total from 40No. units previously approved under extant planning permissions C/2007/1106/O and C/2009/0746/RM. Proposal includes general amendments to site layout with associated siteworks, landscaping, carparking, driveways and garages. Proposed residen ti al development comprising of 38no units to include 10no. detached and 28 no. semi-detached dwellings (reduc ti on of 6no. units total from 44no. units previously approved under extant planning permissions C/2007/1106/O and C/2009/0746/RM) proposal includes general amendments to site layout with associated siteworks, landscaping, car parking, driveways and garages. detached and semi-detached dwellings, with garages and all other associated site works, car parking, landscaping, including local area for play and interac ti ve wetland habitat Lakeside Park comprising reinforced earth bank, aqua ti c marginal plan ti ng, local area for play, interac ti ve wetland habitat , floati ng pontoons, including pumping sta ti on & aera ti on system Proposed redevelopment of former quarry & batching plant including regrading of site levels, to provide new residen ti al development of 207 dwellings consis ti ng of detached & semi-detached houses, townhouses, apartments, with garages, carports, access & associated right turning lane and other associated site works. Redevelopment of former quarry and batching plant, including regrading of site levels and provision of new residen ti al neighbourhood, associated open space and landscaping and ancillary works.
Granted - 3 Oct 2022
6
10
94
1
18.9
16.8
26.2
ESS
B U S H M I L L S R O A D
CR
Def
Def
C L O Y F I N R O A D
28.7
14.6
127
183
139
125a
149
125
167
151
KEY:
159
169
173 171
187
G
127b
215
L37
LWS6
DWELLINGS CONSTRUCTED C/2009/0746/RM, C/2011/0440/F, C/2015/0095/F,LA01-2016-0642-F, LA01/2017/1493/F, LA01/2018/1246/F, LA01/2019/0958/F, LA01/2019/1082/F, LA01/2020/0337/F
214
LWS5
216
L37
LWS6
218
L37
G
220
G G
G
G
219
G G
217
L37
169
212
LWS5.1
221
M1
G
G
Tks
15
LWS5.1
Veterinary Clinic
211
222
Oil Depot
G
S36
G
210
G G
G
1-2
G G
G G
224
LWS5
S36a
225
G
226
227
235
228
223
G
234
S36
G
S36
229
230
LWS5.1
231
233
21
LWS6
232
L35.1
LWS6
G
LWS2
CH
L35.1
LWS6
25
LWS6
LWS2
Bakery Depot
LWS2
EXTANT PLANNING APPROVALS LA01/2017/0732/RM LA01/2021/1029/F
LWS6
LWS6
LWS6
LWS6
27, 29
S p i t t l e H i l l
LWS2
LA01/2020/0337/F
Granted - 31 Mar 2021
G G
LWS2
16
39 to 45
247
251
253
248
252
LWS2
LWS1
249
G
LWS5
250
244
G
G
243
254
LWS2
242
G
245
LWS6
255
LWS2
5
246
22
LWS6
47
L35.2
Business Park
9
49
241a
256
G
G
G
241
261
260
12
L36
8
L35.1
257
259
L36
LWS2
236
LWS2
53
240
G
28
LWS1
7
G
LWS2
237
239
L36
L35.1
258
LWS2
3 to 2
L36
238
L35.2
6
1
L35.2
M1
61
265
E.S.S.
36
G
M1
266
LWS5
G
G
267
LWS2
G
264
LWS6
G
G
268
LWS6
263
269
262
LWS6
G G
G G
LWS6
LWS5
LA01/2017/0732/RM Erec ti on of 108 no. dwellings , comprising
Granted - 9 Apr 2019
270
305
G
271
LWS5
CH
LWS6
275
304
274
G
LWS5
G
G
LWS6
273
G
G G
G
LWS6
LWS6
303
LWS2
272
306
LWS2
LWS5
M1.2
302
307
G
LWS6
LWS6
M1.1
G G
G
L2.1
276
LWS6
308
277
LWS6
301
G
278
279
G G
300
M1.1
LWS6
LWS6
309
G
G G
G G
299
G
7
C/2010/0513/RM
Granted - 24 Feb 2011
298
281a
LWS5.1
LWS38
281
310
G G
LWS38
280
1
LWS6
LWS6
G
M1.1
LWS5
297
311
M1.2
G
LWS6
G
LWS2
9
LWS6
ESS
312
2
G
LWS6
LWS2
LWS6
296
11
282
313
188
282a
186
283
G G
M1.2
284
GLEBE AVENUE
G G
G
15
192
LWS2
190
295
194
314
LWS38
LWS2
315
294
180
LWS38
178
G G
G
C/2009/0746/RM
Granted - 27 May 2010
G
285
176
184
174
200
182
LWS6
293
21
286
LWS5.1
G G
172
LWS6
289
152
G G
150
290
291
G
G G
LWS5.1
14
Tank
GLEBE AVE
287
166
146
100
LWS2
LWS2
LOGUESTOWN GREEN
LWS2
292
288
156
LWS5
154
158
94
L35.1
160
GLEBE AVE
Integrated
10
6
9
Playground
8
7
College
162
3
51
5
4
2
164
1
24
130
92
126
Community
Centre
39
82
C/2007/1106/O
Granted – 4 Jun 2009
G L E B E A V E N U E
29
74
1
66
13
25
Iss
64
15
31
23
45
32
2
Def
52
33
8
TULLYARTON ROAD
53
PERTINENT PERMISSIONS LISTED. OTHER SMALLER / MINOR APPLICATIONS. 22 59 43 Drawing Ref: Project Title: Client: Project Ref: Drawing Title: T201 17166 McAlister Builders PLANNING APPROVALS OVERVIEW NOTE: This map has been produced prior to the establishment of any internal boundaries on site. The boundaries are based on the detailed plans prepared at design stage. Revision:
Date:
09/05/25
Scale:
1:2500
Residential Development, Foxfields, Bushmills Road, Coleraine
Checked By:
Drawn By:
NMK FDMCL
Checked By:
Drawn By:
A
NMK
FDMCL
Future development layout updated - 16/06/25
OUTLINE APPROVED CONCEPT MASTERPLAN
RESERVED MATTERS APPROVED LAYOUT
POLICY CONSIDERATIONS PLANNING ACT (NORTHERN IRELAND) 2011 Section 45 (1) of the Planning Act (Northern Ireland) 2011 requires regard to be had to relevant policies and designations within the Development Plan, and to any other material considerations. NORTHERN AREA PLAN 2016 Within the Northern Area Plan (NAP) 2016, the site is located inside the settlement limit and includes part of the lands zoned for housing as CEH 09, and part of the CEH 10 designation. As ‘Committed Housing Sites’, there are no Key Site Requirements associated with these zonings. However, the majority of the site is on un-zoned land as shown on the extract below.
NORTHERN AREA PLAN EXTRACT (SITE OUTLINE IN RED)
LOCAL DEVELOPMENT PLAN 2038 The draft Plan Strategy is expected to be published in Autum / Winter 2026. Until the Plan Strategy is adopted, the policies and plans contained within the Northern Area Plan 2016 remain operational. STRATEGIC PLANNING POLICY STATEMENT FOR NI EDITION 2 (SPPS) SPPS Edition 2 strengthens the strategic housing policy framework by emphasising sustainable development, high quality design and well connected residential environments. The proposed layout, which remains in full accordance with the approved Concept Masterplan, reflects these principles through its coherent street structure, integrated movement network and sustainable neighbourhood form. PLANNING POLICY STATEMENTS The proposals have been designed and developed in accordance with the following policy considerations: PPS 7 Quality Residential Environments PPS 7 Addendum Safeguarding the Character of Established Residential Areas PPS 8 Open Space, Sport and Outdoor Recreation PPS 15 Planning and Flood Risk PPS 3 Access, Movement and Parking PPS 2 Natural Heritage Supplementary guidance Creating Places and Departmental Parking Standards
SITE PROPOSALS
Proposed Residential Development comprising c.140 dwelling units, public open space, landscaping, new internal road network, access arrangements, parking, and all ancillary site works (Amendment to approved layout ref: LA01/2017/0732/RM) The proposed development of c. 140 dwelling units comprises a mix of 65 social housing units and 69 private for sale and affordable for sale housing units:
LOGUESTOWN INDUSTRIAL ESTATE
LOGUESTOWN GREEN
wetland
PROJECTED EDGE OF LAKE TO BE CONFIRMED
existing reed bed
young trees
41
HT L
FFL
+WL
3.30
c
c
c c
HT L
c
c
existing reed bed
PROJECTED EDGE OF LAKE TO BE CONFIRMED
c c c
c
c
37
HT L
FFL
c
c
3.60
existing reed bed
c
wetland
c
c
c c
c c
HT L
FFL
c
3.60
c
c
45
existing reed bed
HT L
HT L
existing reed bed
c
c c
c
c
c
33
c
wetland
c
1.6m
FFL
HT J
4.40
HT K
HT K
existing reed bed
32
FFL
HT J
4.80
49
51
PROJECTED EDGE OF LAKE TO BE CONFIRMED
FFL
52
indicative bottom of bank
5.80
HT K
young
HT L
FFL
HT L
trees
3.20
existing high water level -1.0m AoD
FFL
existing reed bed
existing reed bed
c
6.20
HT K
77
PROJECTED EDGE OF LAKE TO BE CONFIRMED
FFL
HT I
2.50
FFL
+BB
FFL
HT J
3.00
5.80
FFL
wetland
6.90
HT J
c
FFL
c
6.20
wetland
KEY:
c
FFL
HT K
FFL
7.200
young
HT I
3.50
trees
PROPOSED TREES
HT K
55
FFL
1.2m
existing reed bed
existing reed bed
wetland
0.00
c
c
LAKESIDE PATH
HT A
young
PUMPING
+WL
c
trees
STATION
c c
FFL
c
c
6.90
SHARED SURFACE ROAD/RAISED TABLE
FFL
FFL
FFL
1.2m
7.70
FFL
FFL
FFL
HT I
78
7.40
7.00
4.50
6.50
28
6.10
PROPOSED GRASS AREA
HT I
HT A
HT I
c
HT K
HT K
HT K
HT K
c
FFL
FFL
SOCIAL HOUSES
56
7.20
2.25
60
c
74
c
PRIVATE HOUSES
HT L
FFL
c
HT I
c
123
HT L
c
5.50
HT I
27
134
HT A
c
c
131
HT J
FFL
HT J
FFL
7.50
125 HT I
3.25
HT J
HT J
9-16
c
c
c
HT E
130
FFL
FFL
HT I
SOCIAL HOUSING ALLOCATION
c
HT I
3.00
126
2.20
HT J
HT A
HT J
c
c
FFL
FFL
FFL
TYPE
NUMBER
HOUSE TYPE
TYPE OF DWELLING
TOTAL
FFL
8.20
3.00
4.25
2.30
HT D
FFL
HT C
FFL
HT C
A
8
6P4B
DETACHED
2.65
HT C
HT B
2.65
HT B
81
64
B
12
5P3B
SEMI-DETACHED
FFL
25
HT D
HT A
FFL
68
4.75
HT I
FFL
FFL
4.50
FFL
FFL
4.25
9.00
15
3P2B
3.75
C
TERRACE
5.25
FFL
c
FFL
FFL
FFL
c
FFL
7.20
6.6
FFL
FFL
19.80
3.60
4.20
c
FFL
3.85
HT J
4.20
D
16
3P2B
GN APARTMENT
HT C
FFL
4.60
HT E
4.45
HT J
1.2m
HT C
c
c
HT I
122
c
HT C
c
E
8
2P1B
GN APARTMENT
c
HT I
HT J
HT K
11
HT J
71
c
1.2m
HT K
c
HT J
1.6m
119
HT J
HT D
111
59
c
118
21-24
c
HT K
HT K
1.2m
c
FFL
c
c c
WHEELCHAIR ACCESSIBLE UNITS:
c
6.00
c
FFL
c
c
1.2m
HT C
10
c
c
11.60
FFL
63
F
2
2P1B
WC APARTMENT
HT C
82
c
HT B
c
HT D
c
12.00
HT M
HT C
c
HT B
85
1.2m 1.2m
c
c
84
1
5P3B
G
WC BUNGALOW
c
c c
c
HT B 87
FFL
H
6P4B
1
WC BUNGALOW
HT B
FFL
5.45
6
FFL
5.70
8
c
5.45
c
M
3P2B
2
WC DETACHED HOUSE
c
c
FFL
HT L
FFL
c
c
c
c
4.9
HT F
13.25
FFL
HT F 90
1.6m
HT M
FFL
HT L
HT D
6
FFL
c
13.70
HT A
110
c
4.90
1.2m
8.20
1.35m
1.35m
c
c
HT K
22
c
OVERALL TOTAL (SOCIAL)
65
HT C 98
ROAD 1
HT K
HT C
0.9m
HT C
104
c
FFL
c
1.0m
HT C
HT C
c
4.50
HT C
c
c
HT E
103
FFL
HT D
FFL
17-20
4.50
4.50
FFL
HT G
FFL
c
3.65m
4.00
FFL
HT A
PRIVATE HOUSING ALLOCATION
10.20
Sub-Station
FFL
73
9.00
FFL
FFL
3.85
HT H
c
9.65
FFL
14.50
FFL
4.20
HT D
61
9.40
TYPE
HOUSE TYPE
TYPE OF DWELLING
TOTAL
HT A
FFL
FFL
FFL
FFL
8.65
FFL
FFL
8.90
4.50
18.75
I
6P4B
11
DETACHED
97
8.15
7.90
c
HT B
HT D
HT B
J
5P3B
18
SEMI-DETACHED
1
c
c
c
HT B
K
4P3B
18
SEMI-DETACHED
c
HT B
HT B
HT B
HT E
91
L
22
4P2B
APARTMENT
1-8
c
TOTAL (PRIVATE)
69
c
134
OVERALL TOTAL (SOCIAL & PRIVATE)
N
7-9 Stone Row, Coleraine. BT52 1EP T: 028 70354400
E: start@mi-architects.com W: www.mi-architects.com
Project Title:
LAKESIDE HOUSING DEVELOPMENT COLERAINE
Drawing Title:
SITE LAYOUT PLAN
25.113 A02
1:500 @ A0
RB GM
05/26
AS BUILT TOPOGRAPHICAL SURVEY REQUIRED TO CONFIRM NUMBERS
SUBJECT TO ALL STATUTORY APPROVALS
PROPOSED SITE LAYOUT
ACCESS • Vehicular access is provided from Bushmills Road, via the existing Lakeside residential development • The access arrangement builds on established routes, avoiding the need for new direct access points onto Bushmills Road • Streets within the development are designed as informal, low speed residential streets, prioritising safety and ease of movement • A well connected street network allows residents to move comfortably through the site • Clear pedestrian routes connect homes to open spaces, the lake and surrounding neighbourhoods • Walking and cycling are encouraged through direct, legible and attractive routes
LANDSCAPE AND OPEN SPACE STRATEGY The proposed development is shaped around a strong, connected network of green spaces, with the existing lake forming the central feature. The open space strategy is landscape led, protecting natural assets while creating welcoming places for everyday use. LAKE AND GREEN CORRIDORS • The lake is retained and enhanced as the main open space focus • Informal paths allow people to enjoy views and walk along a landscaped green corridor on the periphery of the lake • Planting creates a natural, tranquil setting • Landscaped green corridors connect homes to the lake
• Safe, attractive routes for walking and cycling • New trees and planting enhance biodiversity • Integrated Sustainable Drainage (SuDS) to manage surface water naturally NEIGHBOURHOOD OPEN SPACES • Smaller open spaces located throughout the development • Informal, landscape led play opportunities • Integrated into the wider open space network and nearby equipped play area • Easy access for residents of all ages • Designed with natural surveillance from surrounding homes
L A K E S I D E Landscape and Waterfront Concept
Existing Views
Typical Cross Sections
Scale 1:200
LEVEL
proposed
+10.0
-1.0m AoD high water level
+1.0m AoD path level
1:2 grass bank
existing
+5.0
young trees
marsh/reed beds W E T L A N D
+0.0
-5.0
View 1: Existing western lake shore with inundated shallows, irises and reed beds
existing ground level
-10.0
-1.5m AoD minimum water level
proposed
+1.0m AoD path level
+10.0
-1.0m AoD high water level
1:2 grass bank
+5.0
marsh/reed beds W E T L A N D
+0.0
View 1: Existing southern lake shore with shallows, reed beds and scrubby trees
Proposed Shore Treatment
-5.0
existing ground level
-10.0
-1.5m AoD minimum water level
An example of avenues of street trees set in wide grass verges
tree planting
proposed
+2.0m AoD path level
+10.0
-1.0m AoD high water level
1:2 grass bank
+5.0
marsh/reed beds W E T L A N D
+0.0
-5.0
Chartered Landscape Architect
Chartered Town Planner
T: 07714 798607 E: d.dalzell@tinyworld.co.uk
"Fairview", 10 Fairview Lane, Articlave, Coleraine, BT51 4JX
existing ground level
Lakeside Residential Development Phase 2 Project: Bushmills Road, Coleraine
-1.5m AoD minimum water level
-10.0
Concept: Provide a shared cycle and pedestrian route along the waterfront. Elevate path above water level to permit views over existing reeds. Conserve existing waterfront vegetation and shallows where possible. If necessary relocate plants to new water's edge. Grass slope down to "soft" shoreline. New path will link proposed roadways and public open space. New specimen parkland tree planting along path. Provide appropriate warning signage and lifesaving equipment.
Landscape and Waterfront
Drawing:
Title:
27/04/2026 Concept
25-170 PACC-01
Date: Scale:
Drawn:
DRD
Examples of Street Trees providing winter interest (bark colour) and spring flowering
Photo: The riverside path, Christie Park, Coleraine
Checked:
DRD
as shown
INDICATIVE HOUSE TYPES
Front Elevation 1:100
Rear Elevation 1:100
Side Elevation 1:100
LIVING ROOM
BEDROOM 1
BEDROOM 2
WC
BEDROOM 3
DINING
STORE
STORE
PRELIMINARY DRAWING
LINEN STORE
BEDROOM 4
7-9 Stone Row, Coleraine. BT52 1EP T: 028 70354400
KITCHEN
Side Elevation 1:100
BATHROOM
ENTRANCE HALL
E: start@mi-architects.com W: www.mi-architects.com
Project Title:
First Floor Plan 1:100
Ground Floor Plan 1:100
LAKESIDE HOUSING DEVELOPMENT COLERAINE
Drawing Title:
HOUSE TYPE A
HOUSE TYPE A 6 Person 4 Bed Detached House - 105 sq/m
Drwn By: RB
Ckd:
Scale & Size: 1:100 @ A3
Drawing No.:
Revision:
25.113 A10
GM RB GM
05/05/26
HOUSE TYPE A
Front Elevation 1:100
Rear Elevation 1:100
Side Elevation 1:100
LIVING ROOM
LIVING ROOM
BEDROOM 1 7.9m2
BEDROOM 1 7.9m2
BEDROOM 2 13.0m2
BEDROOM 2 13.0m2
WC
WC
DINING
DINING
LINEN STORE
LINEN STORE
STORE
STORE
STORE
STORE
BEDROOM 3 11.5m2
BEDROOM 3 11.5m2
KITCHEN
KITCHEN
Side Elevation 1:100
BATHROOM
BATHROOM
ENTRANCE HALL
ENTRANCE HALL
7-9 Stone Row, Coleraine. BT52 1EP T: 028 70354400
E: start@mi-architects.com W: www.mi-architects.com
First Floor Plan 1:100
Ground Floor Plan 1:100
Project Title:
LAKESIDE HOUSING DEVELOPMENT COLERAINE
Drawing Title:
HOUSE TYPE B
HOUSE TYPE B 5 Person 3 Bed Semi-Detached House - 91 sq/m
Drwn By: RB
Ckd:
Scale & Size: 1:100 @ A3
Drawing No.:
Revision:
25.113 A11
PRELIMINARY DRAWING
GM RB GM
05/05/26
HOUSE TYPE B
INDICATIVE CGI’S
BENEFITTING THE COMMUNITY THE DEVELOPMENT PROPOSALS WILL DELIVER A NUMBER OF COMMUNITY AND ECONOMIC BENEFITS AS OUTLINED BELOW: • Delivery of 134 high-quality new homes including a mix of housing options to meet local needs including social, private for sale, affordable for sale with the provision of wheelchair accessible units. • Investment of £25 million in the local economy with the creation of circa 50 gross jobs full time equivalent (FTE) jobs supported on average during construction (c. 2.5 years) • Creation of a new lakeside walkway and a significant area of public open space both designed for community use, wellbeing, biodiversity enhancement and an attractive setting for the development providing opportunities for recreation and enjoyment. • Completing the Lakeside development with circa 550 new residents living in new homes, integrating with the existing development, with connected routes and shared open spaces that allow movement between the new and established areas. HAVE YOUR SAY Get in Touch CALL US: 028 9043 4333 WRITE TO US: TSA Planning, 20 May Street, Belfast, BT1 4NL EMAIL: info@tsaplanning.co.uk Our project team is available Monday-Thursday 9am-5pm and Friday 9am-2pm to discuss the proposals or respond to any queries you may have. Complete a Comment Card: Comment Cards can be completed in-person at the event or returned at a later date to a member of our project team. Website feedback: The online website has a facility to provide your feedback via www.lakesideconsultation.com CLOSING DATE FOR FEEDBACK - FRIDAY 12TH JUNE 2026.
Made with FlippingBook flipbook maker