TSA Planning Lidl Dromore Development

The Proposal

It is proposed to demolish the existing buildings within the site, including 11, 13 and 16 Lower Mount Street, which are within Dromore Conservation Area, and erect a modern foodstore with a sales area of c1,499m2, car parking, hard and soft landscaping works, and all associated site and access works. Images show that the proposal will significantly improve the appearance of the site.

72.45

72.41

72.33

Existing Stream

Proposed pathway

72.42

Crash Barrier

Crash barrier

72.61

Proposed 2.1m high wall to boundary

73.15

73.20

73.21

73.34

73.51

73.38

73.76

73.50

73.79

Proposed Trolley Bay & Cycle Stand Existing Culvert to be diverted

73.77

73.44

73.87

73.51

Plant Compound Area

Proposed 2.1m Timber Boundary Fencing

Proposed 1.4m high retaining wall with 1m high guard rail on top

73.94

74.4173.82 74.49 74.0

73.60

73.60

73.97

73.95

7744..5423

FIRE ESCAPE

74.29

D-26

SECURE STORAGE AREA

D-19

Wall

74.07

74.04

73.95

74.17

D-01

Existing trees to be removed

74.03

74.44

73.80

74.0

PLANT

ROOM

D-04

74.30

IT ROOM

D-18

74.00

Roof=78.30

Ridge=80.72 Eaves=78.75

FIRE ESCAPE

74.01

D-02

73.18

73.82

74.42

(Overgrown)

FIRE ESCAPE

D-17

74.34

CANTEEN

D-09

D-03

72.41

CORRIDOR

73.06

STORAGE AREA (2)

73.10

74.40

Wall

73.85 74.40

CHILLER

74.35

74.08

73.17

74.50

D-08

72.75

LOCKER ROOM

D-07

Proposed Loading Bay

SHOWER

73.84

74.37

WC FEMALE

74.03

72.77

Ridge=78.91 Eaves=77.40

73.90

73.01

74.39

WC MALE

72.74

74.41

Proposed Pedestrian Linkage to Lidl Store

73.67

MEETING ROOM

D-05

74.50

72.74

74.00

D-06

73.93

72.98

FREEZER

73.0

72.73

D-10

OPERATIONS OFFICE

Wall

WELFARE LOBBY

LP

7 4 .7430. 2 5 73.13

74.22

CUSTOMER WC

72.68

D-11

73.43 73.46 73.49 73.66 Kerb

74.56

22715 74.38

Wall

74.0

D-15

74.0

74.42

D-12

72.59

D-13

Smartb

Smartb

l ocks.co.uk ©

l ocks.co.uk ©

73.58

Smartb l

ocks.co.uk ©

Smartb

l ocks.co.uk ©

CUSTOMER LOBBY

(Overgrown)

72.73

74.46

Wall

72.98

73.61

73.70

74.12

74.51

VOLVO

D-23

VOLVO

72.78

74.33

MH 73.44 73.51 73.49

73.73

73.20

74.00

RS

STORAGE AREA (1)

D-14

NEW SECTION OF CULVERT

72.76 72.87

74.53

74.44

73.64

BAKERY PREPARATION

74.30

27P 72.631

(Overgrown)

D-16

74.55

74.60

73.57

41

27

D-25

72.70 72.80

73.53

74.36

74.30

74.26

73.12

74.7344.71

74.50

VOLVO

MH

74.38

73.28

74.66

Kerb

73.62

STORAGE ROOM

G

73.39

72.81

73.40

73.51

Ridge=83.02 Eaves=80.08

72.85

72.70

73.54

73.48

77 44 .. 64 23

FL

72.83

BT 73.46

73.58

JB

P

74.35

21P 74.576

D-22

G

73.49

1

1

D-24

FL

73.28

74.49

Ridge=82.15 Eaves=78.76

73.38

74.36

Ridge=81.61

MH

74.64

74.36

73.69

73.35

73.20

73.35

73.75

74.15

50

50

26

74.59

73.41

BT 73.50 73.51 73.49

LP

74.64

73.4673.50 Eaves=80.43

73.43

72.72

SALES

73.51

FIRE ESCAPE

LP

WM

73.51

73.43

AREA

74.96

1

73.10

72.7627.6752.65

73.43

73.38 73.42

1499 Sqm

74.79

6500

FIRE ESCAPE

BL

73.49

74.84

AP

Bin

73.0

75.44

74.59

74.99

74.35

72.92

ENTRANCE POD

74.49

72.93

73.41

MH

73.47

50

73.20

72.81

73.42

73.40

73.36

74.47

74.44

75.43

BL

73.43

(Overgrown)

73.36

73.09

75.00

(Overgrown)

(Overgrown)

72.88

Wall

73.37

73.38

8P 73.457 73.36 Kerb

73.46

87

86

73

72

73.38

75.37

75.03

73.36

74.67

26P 73.185

FH SV SVSV 73.46

73.48

Wall

6600

73.42

BL

75.34

74.95

73.40 73.38 73.36

73.37

74.59

74.51

73.44

73.40

73.21

75.36

73.34

74.90

Wall

73.19

Kerb

LP

73.49

75.34

73.35

74.49

Channel

73.36

74.71

O/H Elec Wires

42

73.41 73.44

74.52

75.27

17P 75.042 75.07

73.48

74.42

(Overgrown)

73.27

60

74.57

73.37 73.30

74.15

75.09 75.18

75.05 74.88

73.13

75.10

10P 73.427 73.46

75.22

MH Existing Community Garden 73.30

Kerb

Bin

75.0

75.01

73.01

BL

73.11

73.39

73.37

75.47

73.32

73.41

74.96

74.50

74.50

74.90

G

74.37

74.78

73.20

75.20

74.65

MH

73.30

MH

73.02

RS RS RS

JB

73.55

(Overgrown)

74.60

73.14

74.60

73.24

73.51

74.57

74.83

73.26

75.16

75.0

e-car e-car

73.09

72.91

73.27

73.60

73.25

74.81

74.96

74.58

73.04

64000

74.80

74.88

74.35

73.16

75.25

MH

75.29

75.46

22P 74.581

6500

6000

6500

73.06

74.69

74.79

74.95

18P 74.874

75.16

Kerb

75.11

74.79

73.25

Eaves=79.04

74.34

61 LINE OF EXISTING CULVER T 1 73.85 73.24 73.26

73.08

73.25

74.86

Ridge=80.61 Eaves=77.73

75.02 O/H Elec Wires

73.22

74.54

1

78.05

73.0

FL FL

VOLVO

G

73.22 73.30

(Overgrown)

73.22

WM 73.01 73.10

50

50

Kerb

7P 73.492

6P 73.331

74.79 74.59

74.74

75.07

Wall

73.23

73.16

77.57

74.57

74.15

73.10

(Overgrown)

73.30

73.31

73.14

74.88 Proposed Lidl Type 15 Store

73.21

74.60

74.95

73.05

73.45

74.70

VOLVO

WM

Kerb

77.12

24P 73.047

1

Wall

74.83

74.82

73.00

73.13 Proposed 2.1m Timber Boundary Fencing

73.20

73.19

50

WM

74.59

1

VOLVO

77.07

74.67

25P 73.223

73.06

VOLVO

73.25

93

80

79

66

74.74

50

74.87

74.90

74.64

76.77

74.50

74.48

74.74

MH

73.08

73.13

73.0

74.67

74.61

G

Ridge=81.41 Eaves=78.61

73.28

74.79

76.32

Proposed 2.1m high Wall to boundary to replace existing wall

73.11

74.44

74.50

73.07

G

Channel

74.35

Wall

73.15

VOLVO

EP

73.06

74.59

Wall

73.19

74.53

72.87

74.27

23P 73.108

74.66

MH

74.75

74.64

48

73.08

72.97

73.10

74.54

Wall

(Overgrown)

6500

16

VOLVO

20P 74.458 74.45

7 4 .7648. 4 1

53

G

74.67

73.25

G

Wall

73.20

73.07 Kerb

(Overgrown)

73.40

G

LP

MH Proposed Timber Knee Rail to Front Boundary 73.12 73.12 73.03

15

10

74.49 74.50 Kerb

VOLVO

65

74.75 Site Boundary (Red Line)

74.69

74.47

Ridge=84.30 Eaves=82.20

73.15

(Overgrown)

DP

73.17

74.15

74.43

74.08

747.46.937 74.13

(Overgrown)

LP

G

74.47

5P 73.220

72.97

75.04

74.78

73.11

09

Wall

74.54

74.38

FL

74.25

74.34

73.60

VOLVO 73.00

73.11

RS 73.10 73.1703.13 73.28

MH

P

73.17

JB

74.46

73.18

73.05

73.04

73.18

LP

2P 73.116 73.11 73.14

LP

73.19 73.19

73.21

74.43

74.67

74.46

73.20

WM 73.14

74.35

73.07 73.15 73.09

73.17

74.59

73.10

WM 1P 73.138

74.40

G

Wall

Wall

73.13

Kerb

74.00

74.35

74.61 HGV Turning Area 74.87 Kerb Channel

73.13

G

Kerb

G

Kerb

G

74.46

73.07

73.04

72.99

73.00

73.06

72.97

72.99

P

73.03

73.12

73.07

74.38

73.99

VOLVO

MH

73.00

73.15

73.85

73.16

73.08

73.07

73.80

74.54

MH MH

73.27

73.05

74.29

73.22

74.39

73.17 73.17

49

Wall

73.24

73.24

74.56

MH

16P 74.661

73.22

WM

MH

73.02

73.95

SV

73.26

73.20

73.09

73.25

73.81

MH

FH

73.95

SV

SV

Kerb

73.32

74.76

74.53

73.10

19P 73.825

73.50

Line of Existing Culvert

74.38

MH

MH

74.04

MH

73.34

73.64 73.67

73.29

73.27

74.28

Wall

MH

73.28

G

01

73.32

73.39

73.23

11P 73.370

74.6574.67

73.39

52

73.27

GV

74.0

1

73.10

LP

73.38

73.35

G

73.42

Kerb

WM

73.26

74.50

74.73

74.16

73.38

73.30

RS

RS 73.29

73.38

73.26 73.24

73.16

73.35

73.22

40 73.59

P 74.78

73.21

G

73.47

MH Proposed Site Entrance 73.50 73.55

74.21

Eaves=78.64

74.49 2No. EV Charging Spaces 74.75 Kerb

G

73.23

73.26

73.29 Kerb

73.19

73.37

73.33

G

WM

73.50

Kerb

73.36

73.25

Kerb

73.18

G

Schedule of Accommodation Type 15 Store- Sales Area 1499 sqm Site Area (Red Line)1.93 Acres Lidl Parking Spaces 93 5No. Disabled Parking Spaces 6No. Parent & Child Spaces 2No. EV Charging Spaces 8No. Cycle Spaces

73.58

Kerb

73.37

BT

LP

73.30

MH

74.11 74.13

73.60

73.28

Channel

4P 73.266 73.28 73.26

73.34

73.39

73.47

74.27

73.30

73.42

73.44

73.21

73.60

73.13

G

73.42

73.34

73.40

Bin

MH

G 74.05 73.89 73.96 74.09 SV SV 74.13

73.52

RS

73.31

WM

73.45

Kerb

73.32

73.60

74.50

BT

FH

73.52

73.50

73.61

WM

73.48

73.54 73.51

FL

73.22

WM

73.23

Wall

7733..2214

FL

73.55

RS

7733..5793 73.61

G 73.22

74.86

MH

WM

FH

WM

G 73.10 72.99 Kerb

BT

Ridge=85.03 Eaves=82.19

73.59

73.61

73.59

12P 73.579 73.61

73.18

73.64

73.55 73.53

73.66

73.56

TP 73.58

73.66 Drop Kerb

LP

74.64

73.63

73.94

73.53

75.09 Proposed Timber Knee Rail to Boundary

73.59

G

73.55

Ridge=82.43 Eaves=79.70

73.88

72.94

Ridge=84.68 Eaves=82.68

14P 73.885

73.77

Wall

Kerb

BT

74.96

73.59

73.82

73.85

73.62

75.31

73.53

Wall

LP 76.88

76.96 77.21

74.36

75.80

73.51

73.89

FH

15P 75.846 76.28

75.35

76.75

74.08

SV

73.79

BT

Flag Pole

G

MH

MH

76.82

73.85

G

73.59

Kerb

74.12

73.98

74.44

77.02

75.83

74.02

G 73.90

MH

73.72

76.18

76.91

76.25

Kerb

73.85

73.50

CCLL

Ridge=81.11 Eaves=78.83

7 7474.4.0.19101

74.24

WM 74.30

74.46

73.62

MH Building No. 11, 13 and 15 to be demolished MH MH 75.31 75.67 75.61

73.42

74.33

74.76

73.51

MH

76.42

77.03

Ridge=82.84 Eaves=80.23

75.05

Kerb

74.41

73.49

75.17

G LP 74.66

73.53

73.75

74.91

MH

CL

76.58

76.95

MH

76.34

FL

CL 75.11

76.51

77.09

75.54

74.99

75.57

75.28

BT

75.43

MH

76.87

MH

76.70

G

Kerb

WM

75.58

76.27

MH

CL CL

76.36

Site Layout Plan Scale 1:250

76.79

MH

7 5 .77512. 7 9

E F

Change of note to Existing Community Garden

date by 13.03.26 JJM 29.04.2026JJM 10.08.26 JJM 31.08.26 NK 02.09.26 NK 16.09.26 NK

G 75.9976.03

MH

WM CL CL

77.27 77.23

77.43

CL

80.97

WM 76.59 7 76 6. .576761. 7 1 CL

WM

MH

Added Access pathway and Building no. 11, 13 and 15.

FL

FL 76.65 76.7167.27 76.14

76.09

CLCL 76.93

76.48

C Easement zon eadded. D Updated Site Access

G

IL

77.01

Ridge=83.93 Eaves=80.97

7 77.71..01168

77.5747.41

FL

B

Culvert Denoted On Plans

rev description A HGV Tracking Added

Page Size

Scale

Date

Stage

Project No.

Dwg.No.

Rev

A1

1:250

Sept 26

3

L471

01-02 F

Work Status

Drawn By Checked By

Project Title

Drawing Title

Proposed Lidl Store At Lands At Lower Mount Street, Dromore

Site Plan

Concept Design

JW LH

NOTES: This drawing is subject to Statutory & local Council Approval. This drawing is subject to Planning Approval. This drawing is subject to Building Control Approval. This drawing is subject to a Specific Building and Site Survey. The copyright in this drawing remains vested with Clarman and cannot be reproduced without the express written approval of Clarman.

Client

Lidl Northern Ireland Ltd

Made with FlippingBook Ebook Creator