Carrowdore Development
Hello and Welcome Introduction
Welcome to our virtual Pre-Application Community Consultation (PACC) website. This website forms part of the Community Consultation in respect of lands at the Former Ards Building Site, 50Main Street, and lands to the rear of Nos. 38-48 & 52-68a Main Street, Carrowdore. The concept proposal comprises a residential development of c. 90no. dwellings, including for detached and semi-detached units, on the lands outlined in red.
Consultation during COVID-19
130
Playing Fields
RH
128
Changing Rooms
126
124
Carrowdore Pri Sch
Carrowood
122
7
BB
13
33.7
120
1
23
ESS
123
12
1
CASTLE PLACE
114
2
2a
J O H N S T O N P A R K
Plygnd
105
33
36
10
110
26
18
Carrowdore Comm Cen
Und
2
2
16
106
33.3
8
ASHVALE PARK
29
12
1
ESS
3
23
21
103
100
15
11
5
M'Briar Meadow
Def
96a
5
26
97
96
In light of the current situation under COVID-19 restrictions and social distancing measures, temporary pre-application community consultation regulations were introduced. These removed the requirement for a public event but encouraged and provided guidance for alternative consultation measures. We are using a number of online, digital, and remote tools to help you provide feedback on our proposals. Purpose of Consultation and Next Steps The purpose of this webpage is to share our indicative proposals with the community and other interested parties, prior to the submission of a Full Planning Application to Ards &North Down Borough Council. We are committed to engaging with members of the wider community and are now undertaking a period of pre-application community consultation (PACC) on our proposals. This consultation does not relate to a planning application. Comments should not be made to Ards &North Down Borough Council at this time. Any comments made to the prospective applicant are not representations to the planning authority. The feedback received as part of this consultation will be shared with the design team and will help to shape our proposals prior to the submission of a planning application. We will prepare a Pre-Application Community Consultation Report which will provide a summary of all feedback, our response and how we have incorporated any appropriate feedback into the final proposals for the scheme. This report will be submitted as part of the Full Planning Application to Ards &North Down Borough Council.
3
94a
1
94
2
13
4
92a
33.7
17
92
90
12
13
CASTLE MANOR
95
N E W R O A D
1
84
88
5
7
33.9
Carrowdore
89
30
ESS
77
65
70
81
73
22
Presb Ch
TCB
68a
71
68
Hall
35.7
CHURCH ROAD
CH
2
14
17a
8
63
10
CHURCH ROAD
12
17
61
4
2
1
36.8
52
59
CHURCH PK
CHURCH CT
1
7
2
CHURCH WALK
1
11
53
1
48
1
51
38.5
46
CHURCH LANE
7
11
47
2
43
6
15
39
PH
35
12
1
40
14
M A I N S T R E E T
12
24
38
2
45
CASTLE MEADOWS
43
8
31
18
9
2
5
26
38.9
2
39
CASTLE MEADOWS PK
CASTLE COTTAGE CL
4
1
33
11
3
6
2
21
CS
26
15
27
CASTLE MEADOWS DR
17
28
1
17
36.9
22
15
Hall
30
2
11
CD
21
20
9
2a
3
3
15
32
B A L L Y R A W E R A V E N U E
4
16
12
1
THE STABLES
CH
10
11a
4
35.0
CD
2
8
6
12
9
8
Hall
6a
6
7
CB
10
4a
2
RH
3
Issues
33.3
Tank
4
1
3
5
CB
QUARRY
COURT
6
7
1a
31.5
8
Def
1
How to provide feedback and find out more Through our Website
In addition to browsing our proposals on this website, you can provide your comments by completing our online feedback
form [HERE]. Speak to Us
Our project team is available Monday-Friday 9am-5pm to discuss the proposals or respond to any queries you may have. Contact: TSA Planning Tel: 028 9043 4333 Email: info@tsaplanning.co.uk Download the Proposal Pack You can download an electronic copy of the proposals pack by clicking the link on the homepage. If you have any issues downloading the PDF then please call TSA Planning on 028 9043 4333, or alternatively email info@tsaplanning.co.uk. Closing date for feedback Friday 17th June 2022 at 5pm
Strategic Context and Site Location
The subject lands are located within the settlement of Carrowdore, on lands to the rear of Main Street. These were previously home to the Ards Building Products Site. Accessed via Main Street, the adjacent context comprises a mixture of residential formats (single storey / two storey), along with various other land-uses of a commercial and recreational nature (Eurospar Petrol Filling Station and Carrowdore Community Centre). The site is bounded to the northeast by residential development under construction at McBriar Meadow, with access to the lands via Main Street to the south currently presenting as a current gap site between Eurospar Filling Station and No. 26Main Street. The northwest boundary is defined by a strong vegetated hedgerow with agricultural lands beyond. This is similar to the southwest boundary, again defined by a mixture of woodlands and hedgerows. The site itself extends to 3.27Ha (c. 8Ac) and is broadly irregular in shape, comprising large areas of hardstanding. Residential development has previously commenced to the front portion of the site onMain Street, with the remaining lands undeveloped following closure and demolition of the former commercial premises.
FIGURE 1 – SITE LOCATION
CARROWDORE COMMUNITY CENTRE
MCBRIAR MEADOW
EUROSPAR
MAIN STREET
ROCKFIELD MEADOWS
Area Plan Context Within the Ards &Down Area Plan 2015, the subject site is entirely within the Settlement Development Limit of Carrowdore and has been left as white land.
FIGURE 2 – ARDS &NORTH DOWNAREA PLAN 2015
Planning History The principle of residential development has previously been established on these lands, following approval of 98no. dwellings (Ref: X/2009/0470/F). This permission was enacted through the discharging of conditions and development works including the provision of access arrangements and the foundations of Plot Nos. 1-3 being constructed. These works have been certified as being lawfully enacted by the Council (Ref: LA06/2018/0050/LDE).
FIGURE 3 – APPROVED LAYOUT X/2009/0470/F
Amendments to this original permission have more recently been approved by the Council (Ref: LA06/2019/1012/F), including for layout alterations to the front nine dwellings onMain Street.
FIGURE 4 – APPROVED LAYOUT LA06/2019/1012/F
Site Proposals We are currently carrying out a Pre-Application Community Consultation in respect of our proposals on lands at the Former Ards Building Site, 50Main Street, and lands to the rear of Nos. 38-48 & 52-68a Main Street, Carrowdore. The proposal comprises a residential development of c. 90no. dwellings, including detached and semi-detached family home. The key design principles which have informed the proposed layout are as follows: - • Provision of a range of high-quality 3/4-bed family homes in a well landscaped setting; • Ensure a range of dwelling sizes and types (detached and semi-detached) to promote choice for future residents; • Provide dual frontage dwellings at key locations to ensure a high-quality streetscape and frontage; • Respecting amenity of adjacent residents at McBriar Meadow and Main Street, through adequate separation distances and layout provisions; • Provision of at least two parking spaces for all dwellings; • Design of a spacious layout which allows for various areas of public open space within the development, totalling more than 10% of the overall site area; • Connectivity to Main Street through inclusion of a landscaped pedestrian link; and • Retention of existing vegetated boundaries where practical and further supplementing of these at edge-of-settlement locations.
Proposed Site Layout
33
32
31
Housing break down house name house type
30
29
P07
Beds 3 3 3 4 3 3 4 3 3
N0. 22 24 4 10 6 10
28
P01
27
Carrowdore
P01 P02 P03 P04 P05 P06 P07 P08 P09
26
Semi-det Semi-det Semi-det Semi-det Detached Detached Detached Detached Semi-det
P02
25
24
P04
P03
23
22
P01
47
48
P01
P02
46
P02
49
P06*
P03*
8 2 4 88
45
21
50
44
P01
Landscaped Bank
20
51
P07
43
52
Open space 0.145 Hectares
19
TOTAL PLOTS
P02
P02
42
P06
P09
53
70
18
41
73
Landscaped Bank
P02
40
17
54
P01
P02
74
Landscaped Bank
Open space 0.054 Hectares
55
TCB
68a
72
16
39
P07
P06*
75
71
56
38
P01
15
P04
68
57
76
Open Space Calculation Area of total site Area of Open Space 0.445hectares or 12.4% 3.577hectares
P06
14
P07*
P04
70
37
CH
P05
58 Landscaped Bank
34
36
77
69
P02
Landscaped Bank
59
35
P05
P07
78
68
P02
60
P06
79
61
67
P01
Open space 0.155 Hectares
P02
P02
P06
80
62
66
P02
8m Landscaping Buffer
P05
P05
81
36.8
52
65
P01
Landscaped Bank
13
P06*
59
P04
82
P07*
64
12
P06*
8m Landscaping Buffer
83
11
FUTURE PHASES
63
84
P04
10
Open space 0.076 Hectares
P01
Landscaped Bank
53
48
9
8m Landscaping Buffer
51
38.5
P06
46
P08
8
7
47
6
43
8m Landscaping Buffer
P05
39
5
PHASE 1
PH
M A I N S T R E E T
P09
35
4
40
14
12
3
38
2
P07
P01
8m Landscaping Buffer
1
P07*
8
31
85
86
38.9
2
P06*
P05
39
87
CASTLE COTTAGE CL
Open space
0.015 Hectares
88
1
33
3
P08
21
26
Benefitting the Community The development proposals will deliver numerous community and economic benefits as outlined below • Development of c. 90no. high quality family homes for Carrowdore in a range of house types and styles • Significant boost to local rates provision for Ards &North Down Borough Council upon occupation of the dwellings • An investment of between £15-20million in the local economy from the private sector • The creation of c. 70no. jobs throughout the construction phase, supporting the local labour market and providing job opportunities for trade skills. Have Your Say Give Us a Call If you would like a member of the team to discuss our proposals over the phone with you, you can call us on 028 9043 4333 Write to Us If you wish to make comments on the proposals, you can also do so in writing by sending a letter to:
TSA Planning 20May Street Belfast BT1 4NL Complete a Comment Card
Comment Cards, along with a self-addressed envelope, have been delivered to dwellings and businesses within the vicinity of the proposal site. These can be filled in and returned as directed. Alternatively, electronic comment cards can be completed [Here] Closing date for feedback – Friday 17th June 2022 at 5pm